Wednesday, April 15, 2015

While our current rainy weather has slowed work a bit, framing was able to start again today. These photos show the auditorium taking shape and the "West Lobby" that will lead patrons back to the new restrooms (located where your photographer is standing!)



Very soon, new roof trusses will be installed to span (in a north/south configuration) that historic, intimate room for theater that we love so much.

In this shot, you can really see the forest of plumbing needed for a modern theater: patron restrooms, a backstage kitchen/coffee bar, two actor restrooms (both with showers), a utility sink and a paint sink. Soon, these PVC pipes will be joined by a pit for the elevator that must be dug before the new slab is poured.




No comments:

Post a Comment